Skip to content
ODOOVATIONShome

Games, connected devices and Web3

Game development

Game development starts with a playable prototype or a vertical slice, a small but finished piece of the game, so you can test whether it is fun and what full production would cost.

What does game development from ODOOVATIONS include, and what does it cost?

Original interaction design, assets, a build and acceptance evidence. There are three packages, from From USD 6,000 (≈ PKR 1,659,600), starting fee, each with a stated scope. Prices are launch offers in US dollars before taxes; a written scope confirms the final price before any work starts.

Is this the right purchase?

The problem it solves

You have a game idea and quotes for the whole game that nobody can justify.

Who it is for

Studios, brands and educators with a game concept.

When it is the wrong first step

Full production is quoted after the prototype. We do not claim released titles.

What is included, and what is not

We deliver

  • A playable build at the tier
  • Original interaction design and assets
  • A production backlog and estimate

You provide

  • Concept and audience
  • Platforms
  • Art direction
  • Plays and gives feedback
  • Owns publishing accounts

Priced separately

Platform, engine, art, devices, networking and live operations determine the final cost.

Packages

Priced per agreed vertical slice. Launch prices in US dollars, before taxes. There is no online checkout: choosing a package starts a conversation and a written scope.

Planning: 4–6 / 8–12 weeks for a prototype or slice; full production scheduled separately. Proposed planning range, confirmed after inputs and complexity review; not an advertised market average or an outcome guarantee.

Rupee figures are indicative, converted at 1 USD = PKR 276.6 (rate of 30 October 2026). Prices are set in US dollars; a fixed PKR quotation is given in writing.

How the work runs

  1. Step 1

    Core loop

    What the player does.

  2. Step 2

    Build

    Playable version.

  3. Step 3

    Test

    With players.

  4. Step 4

    Plan

    Production backlog.

When it is done: Done when the build is playable on target devices and the backlog delivered.

What the work looks like

Production backlog (extract)Sample data
ItemEstimate
Level 2–5 design6 weeks
Online leaderboard2 weeks
Store release1 week

Sample data for an original concept. Format only. More samples in the ODOOVATIONS Interactive Lab.

What we measure

  • Playtest feedback
  • Build stability on target devices

Questions buyers ask

Unity, Godot or web, chosen by platform.

Talk to us about game development

Tell us what you need in a few lines. We reply with questions or a written scope; nothing is charged by asking.